14 Contracts Awarded for Road Work
The provincial government has awarded 14 contracts for road work throughout the province at a cost of approximately $59 million.
Over the next five years, the government plans to invest close to $1.4 billion in provincial roads and highways, including $225 million in 2023-24.
The list of contracts includes:
A $6.9 million contract was awarded to Farrell’s Excavating Ltd. for the rehabilitation of a section of the Burgeo Highway and the replacement of two structural plate pipe arches (Route 480);
A $6.2 million contract was awarded to J-1 Contracting Limited to rehabilitate various sections of Routes 335, 340 and 345;
A $5.9 million contract was awarded to Municipal Construction Ltd. for the paving of the Trans-Canada Highway from South Brook to West Bottom; the rehabilitation of South Brook Bridge; the rehabilitation of Grand Falls-Windsor Overpass eastbound and westbound; and the rehabilitation of Grand Falls-Windsor pedestrian overpass;
A $5.7 million contract was awarded to JCL Investments Inc. to pave sections of St. George’s Highway (Route 461); Codroy Road (Route 406); and Block Road (Route 407-13);
A $5.4 million contract was awarded to Marine Contractors Inc. for the rehabilitation of a section of the Trans-Canada Highway from Doyles toward Tompkins;
A $5 million contract to Nortech Construction Co. Ltd. to pave a section of Route 212 and replace a culvert on Route 210;
A $4.2 million contract to Farrell’s Excavating Limited for the rehabilitation of the Whiteway South Highway (Route 420) and Country Road Hampden (Route 421-11);
A $4 million contract was awarded to Marine Contractors Inc. to pave a section of Cormack Road (Route 422) from Route 430 towards the Town of Cormack Municipal Building and a section of Howley Road (Route 401), and to patch sections of the highway between Deer Lake Underpass (TCH-115) and Humber River Bridge;
A $3.7 million contract was awarded to Bay By Bay Ltd. for bridge rehabilitation on Route 360 and 361 – Southeast Brook Bridge, Bay D’Espoir Causeway Bridge, and Miguel’s Brook Bridge;
A $3.5 million contract was awarded to Concord Paving Limited to pave a section of Route 70 through Bay Roberts from Farm Road to the north of the Water Street intersection; pave a section of Lead Cove (Route 80); and pave a section of Perry’s Cove (Route 70-37);
A $2.9 million contract was awarded to Nortech Construction Co. Ltd. to pave a section of Route 220;
A $2.4 million contract was awarded to Bay By Bay Ltd. for the rehabilitation of the Red Harbour East River Bridge and Red Harbour West River Bridge (Route 210); and the rehabilitation of the Southeast Brook Bridge (Route 211-10) and Terrenceville Brook Bridge (Route 211);
A $1.6 million contract was awarded to Marine Contractors Inc. to pave the main road through Trout River (Route 431-14) and culvert replacement on Riverside Drive (Route 431-14-2); and
A $1.4 million contract was awarded to C&T Enterprises Ltd. for the rehabilitation of Postville Airport, apron and access road.
Comments